Auto-Zone CV-CSection 2Sequence of Operation 2-1InitializationInitializationInitializationInitializationOn system powerup LED1 and LED2 are extinguish
Section 2Auto-Zone CV-C2-2 Sequence of Operationf. Updates the diagnostic LED2 blinking.g. Stores data in the internal trend log if ready for another
Auto-Zone CV-CSection 2Sequence of Operation 2-3Comm LED DiagnosticComm LED DiagnosticComm LED DiagnosticComm LED DiagnosticBlinksBlinksBlinksBlinksAs
Section 2Auto-Zone CV-C2-4 Sequence of OperationAnalog InputsAnalog InputsAnalog InputsAnalog InputsOnly Analog Input #1 (AIN1) and Analog Input #6 (A
Auto-Zone CV-CSection 2Sequence of Operation 2-5Analog OutputsAnalog OutputsAnalog OutputsAnalog OutputsThere are two Analog Outputs available on this
Section 2Auto-Zone CV-C2-6 Sequence of OperationPushbutton OverridePushbutton OverridePushbutton OverridePushbutton OverrideOperationOperationOperatio
Auto-Zone CV-CSection 2Sequence of Operation 2-7Heat Mode A heating demand is generated when the space temperature drops half theamount of the Deadban
Section 2Auto-Zone CV-C2-8 Sequence of OperationOccupied/UnoccupiedOccupied/UnoccupiedOccupied/UnoccupiedOccupied/UnoccupiedMode of OperationMode of O
Auto-Zone CV-CSection 2Sequence of Operation 2-9Off Mode of OperationOff Mode of OperationOff Mode of OperationOff Mode of OperationAfter the schedule
Section 2Auto-Zone CV-C2-10 Sequence of OperationDX Cooling OperationDX Cooling OperationDX Cooling OperationDX Cooling OperationIf the user has confi
Auto-Zone CV-CSection 2Sequence of Operation 2-11If you have configured the system to control De-Humidification with the DX Coolingthen the compressor
Section 2Auto-Zone CV-C2-12 Sequence of Operationc.Minimum Off Timer ( User Adjustable )Once a stage has been turned off, it must remain off for this
Auto-Zone CV-CSection 2Sequence of Operation 2-13Chilled Water ValveChilled Water ValveChilled Water ValveChilled Water ValveOperationOperationOperati
Section 2Auto-Zone CV-C2-14 Sequence of Operationbelow the cooling setpoint by the same amount it rose above it to start thedemand.c. Once the cooling
Auto-Zone CV-CSection 2Sequence of Operation 2-15Step Heating OperationStep Heating OperationStep Heating OperationStep Heating OperationIf the user h
Section 2Auto-Zone CV-C2-16 Sequence of OperationExample:Deadband = 1°FSetpoint = 72°FStage #1 Activates @ 71.5°F - Deactivates @ 72.5°FStage #2 A
Auto-Zone CV-CSection 2Sequence of Operation 2-17Once a stage has been turned off, it must remain off for this amount of timebefore it can be restarte
Section 2Auto-Zone CV-C2-18 Sequence of OperationHot Water ValveHot Water ValveHot Water ValveHot Water ValveOperationOperationOperationOperationIf th
Auto-Zone CV-CSection 2Sequence of Operation 2-19Once the Hot Water Valve is enabled for operation, the actual valve position is calculatedusing a Pro
1ed_J_^U3_^db_\CicdU]cForm: AZ-CVC-DS-01A-599-0101Page 1 of 1Technical Data CV-C ControllerPower 24 Volt AC Weight 1.5 lb.Power Consumption 12 VA M
Section 2Auto-Zone CV-C2-20 Sequence of OperationHumidity ControlHumidity ControlHumidity ControlHumidity ControlIf you selected the De-Humidification
Auto-Zone CV-CSection 2Sequence of Operation 2-21Relief Pressure ControlRelief Pressure ControlRelief Pressure ControlRelief Pressure ControlIf you ha
Section 2Auto-Zone CV-C2-22 Sequence of Operationeconomizer watches the movement of the controlling temperature to determine if itshould make any furt
Auto-Zone CV-CSection 2Sequence of Operation 2-23Indoor Air QualityIndoor Air QualityIndoor Air QualityIndoor Air QualityIf you have configured an Ana
Section 2Auto-Zone CV-C2-24 Sequence of OperationFan StatusFan StatusFan StatusFan StatusYou can configure one of the Analog Inputs to monitor a binar
Auto-Zone CV-CSection 2Sequence of Operation 2-25Static Pressure SensorStatic Pressure SensorStatic Pressure SensorStatic Pressure SensorYou can insta
Section 2Auto-Zone CV-C2-26 Sequence of OperationAlarm Detection &Alarm Detection &Alarm Detection &Alarm Detection &ReportingReportin
Auto-Zone CV-CSection 2Sequence of Operation 2-27Cooling FailureAnytime the first stage of cooling is activated on CV-C units the SupplyAir has 30 min
Section 2Auto-Zone CV-C2-28 Sequence of OperationPID OperationPID OperationPID OperationPID OperationThe Hot & Chilled Water Valves are controlled
Auto-Zone CV-CSection 2Sequence of Operation 2-29The Integral ( I ) is added to itself each time through the loop. This prevents the valvefrom stoppin
Notes:CONTROLSFILENAMEDATE:B. CREWSDESCRIPTION:PAGEDRAWN BY:CV-C Controller WiringLine VoltageSee Note 1RSHTRSHTRSHTRSHTAll Comm Loop Wiring IsStraigh
Section 2Auto-Zone CV-C2-30 Sequence of OperationThe Integrating Interval ( TimeSP ) controls how many times per minute the calculationsare made. The
Form: WM-CVC-SQW-01A Printed in the USA March 2002All rights reserved Copyright 2002WattMaster Controls Inc. • 8500 NW River Park Drive • Parkville M
Notes:CONTROLSFILENAMEDATE:B. CREWSDESCRIPTION:PAGEDRAWN BY:CV-C Humidity Sensor WiringJOB NAME1.)24 VAC Must Be Connected SoThat All Ground Wires Rem
Notes:CONTROLSFILENAMEDATE:B. CREWSDESCRIPTION:PAGEDRAWN BY:CV-C Relay Expansion Board WiringLine VoltageLine VoltageSee Note 1See Note 1Required VA F
CONTROLSFILENAMEDATE:B. CREWSDESCRIPTION:PAGEDRAWN BY:LED DescriptionsJOB NAME06/01/00CVCLED1A.CDRAuto-Zone1EXPANSIONSENSORPRESSUREGND7AINAOUT2AOUT1AI